The below Medical projects were successfully estimated and/or managed by representatives of The Knox Group, Inc. This list outlines the experience, dedication, and relationships established with clients across the Bay Area.
Kaiser Permanente NPC 3 Compliance & Constructability Reviews, Multiple Facilities 251,308 sf of constructability reviews and budget planning to establish requirements and a consistent method of compliance for upcoming Nonstructural Performance Category 3 (NPC3) mitigation at each Northern California medical center.
Valley Imaging Partners / Radiologix Conversion, Redwood City, Ca 5,000sf conversion of office space into medical imaging facility containing MRI, CT, X-Ray Fluoroscopy, Mammography, and Ultrasound rooms.
Kaiser Permanente Hospital, Fremont, CA 192,500sf, 106 bed hospital containing two bed wings, intensive care unit, six operating rooms, complete imaging/radiology department, laboratory spaces and general offices.Included coordination and installation of hospital and contractor furnished medical equipment (I.E. MRI equipment, bio-waste sterilizers, medical gas rails, nurse call devices, x-ray lead shielding, O.R. lights/tables, etc.)Project construction completed successfully under OSHPD and Kaiser guidelines.
Lake Park Health Care Center Expansion, Oakland, CA 5,400sf two story expansion of existing facility with a new skilled nursing annex adding 10 beds and activity center for assisted living tenants.
Kaiser Permanente Three North- Surgical Center, San Jose, CA 23,000sf construction of a new outpatient surgical center on existing hospital campus.Construction included three operating rooms, outpatient recovery Areas, and laboratory rooms. Project construction completed successfully under OSHPD and Kaiser guidelines
Stanford Medical Center / Cath Lab Renovation, Palo Alto, CA 1,052sf renovation of existing x-ray and film rooms into a state of the art Cath Lab that included new control room, imaging equipment, rooftop utility and alarm tie-ins.The project renovation was designed and constructed under OSHPD standards.All activity was coordinated and completed during continued operation of the medical center by implementing required infection control program.
Kaiser Permanente Santa Clara Medical Center, Santa Clara, CA (Preconstruction Only) Assisted with one year of budget development and construction planning for 520,297sf hospital including 53 acres of site development.Preconstruction efforts included budget assistance with design development packages, project scheduling, value engineering, constructability analysis, medical equipment coordination, and implementation of Kaiser Permenente?s ?Gate? program for cost studies.
Kaiser Permanente Pharmacy Call Center, Livermore, CA 26,525sf T.I. project.Second floor build-out over pharmaceutical distribution center.Construction consisted of data/telecom. space, regional manager offices, operator call stations with cubical space, 29,951sf parking lot expansion with site utilities and misc. site upgrades, emergency generator and package HVAC rooftop unit installations.
Kaiser Permanente- General Services Bldg. Loading Dock & Renovation, Fremont, CA 8,394sf renovation of hospital campus main services building.Completed expansion of new loading dock and steel canopy, replacement of existing halon fire system with compliant FM200 system, tenant improvement of office spaces and campus phone/data center, installation and hookup of owner furnished Sani-pac sterilizer and dock equipment.